Engineering, pre-commissioning and commissioning of systems (DCS/ESD) Context : The largest gas layer of the world Project located in QATAR in a liquefaction factory.
Mission : To ensure the good taking into account of the To answer the questions of the construction teams ensuring the installation of the systems. To provide the interface between the study team based in Paris and the building site. To ensure technical coordination between the suppliers and the test teams .
Technical aspects : Knowledge of the control systems material (Emerson Delta V) and safety systems (Triconex). Systems DCS (Distribute Systems Control) and ESD (Emergency System Shutdown) |